< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=1949903492493215&ev=PageView&noscript=1" />
Logo Zhengzhou Xinlong Machinery Manufacturing Co., Ltd.

Select Language

English 中文 Tiếng Việt Français Bahasa Indonesia
Home Blog Zhengzhou Xinlong: Leading Cement Tile Machine Manufacturer in China
Back to Blog List

Zhengzhou Xinlong: Leading Cement Tile Machine Manufacturer in China

2026-05-30

Discover Zhengzhou Xinlong Machinery – China’s top cement tile machine manufacturer with 25 years of experience. Specializing in customized equipment and overseas installation guidance.

In the rapidly evolving construction materials industry, selecting reliable machinery manufacturers is crucial for business success. Zhengzhou Xinlong Machinery Manufacturing Co., Ltd. stands out as China’s premier producer of cement tile machines, terrazzo tile machines, and non-removal formwork equipment. With 25 years of dedicated experience since our establishment in 2001, we’ve built a reputation for technical excellence, product reliability, and comprehensive customer service that extends worldwide.

Cement tile machine production line at Zhengzhou Xinlong factory

Company Overview and Core Competencies

Our 30,000-square-meter factory in Zhengzhou houses state-of-the-art production facilities equipped with advanced testing instruments. This enables us to maintain stringent quality control throughout the manufacturing process. As a complete solution provider, we offer:

  • Customized cement tile machinery design and production
  • Comprehensive overseas installation and operator training
  • Full after-sales service network covering all provinces in China
  • Continuous technical support and equipment upgrades

The company’s technical team comprises experienced engineers who stay abreast of industry advancements through regular training and international exchanges. This expertise translates into machinery that meets global standards while incorporating local market requirements.

Product Range and Technical Specifications

Our flagship products represent the pinnacle of construction material machinery innovation:

1. Cement Color Tile Machines

These machines produce the popular colored cement tiles introduced from Europe in the 1990s. Our equipment enables manufacturers to create tiles with:

  • Vibrant, long-lasting colors through advanced pigment mixing systems
  • High compressive strength (exceeding 35MPa) and weather resistance
  • Precise dimensions with minimal deviation (±0.5mm tolerance)
  • Production capacity ranging from 800-1,200 pieces per 8-hour shift

The complete production line includes raw material processing, molding, curing, and packaging systems, all designed for energy efficiency and low maintenance.

Finished colored cement tiles produced by Xinlong machinery

2. Terrazzo Tile Machines

Our terrazzo production equipment incorporates modern vibration compaction technology that ensures:

  • Uniform distribution of marble chips throughout the tile surface
  • High gloss finish without additional polishing processes
  • Flexible production of various patterns and color combinations
  • Dust-free operation meeting environmental protection standards

The machines feature modular design for easy maintenance and quick replacement of wearing parts, minimizing production downtime.

3. Non-Removal Formwork Equipment

This innovative solution revolutionizes concrete construction by:

  • Eliminating traditional formwork removal processes
  • Creating permanent composite structural components
  • Reducing labor costs by 40% and construction time by 30%
  • Improving structural integrity through integrated reinforcement

The equipment’s precision control system ensures consistent product quality across different construction projects.

Customization Capabilities and Overseas Services

Understanding that each market has unique requirements, we offer comprehensive customization services:

Customization Aspect Available Options
Production Capacity From 500 to 2,000 pieces/shift
Tile Dimensions Customizable within 200-500mm range
Automation Level Semi-automatic to fully automatic
Power Configuration 380V/50Hz or customized voltage

Our overseas service package includes:

  • On-site installation and commissioning by senior technicians
  • Operator training covering both machinery operation and maintenance
  • Spare parts inventory planning based on production volume
  • 24/7 remote technical support through video conferencing
  • Periodic equipment inspection and preventive maintenance

Market Success and Industry Recognition

Zhengzhou Xinlong’s machinery has enabled hundreds of clients worldwide to establish successful construction material businesses. Our equipment operates in diverse climates from tropical Southeast Asia to arid Middle Eastern regions, consistently delivering:

  • 98%+ production uptime rates
  • Product defect rates below 0.5%
  • Return on investment within 12-18 months
  • Compliance with local building codes and safety standards

The company holds multiple patents for innovative machinery designs and has received numerous industry awards for technological advancement. Our quality management system is certified to ISO 9001:2015 standards, ensuring every piece of equipment meets global benchmarks.

FAQ

What makes Xinlong’s cement tile machines different from competitors?

Our machines feature proprietary vibration compaction technology that creates tiles with superior density and strength compared to traditional pressing methods. The modular design allows easy upgrades as production needs evolve, protecting your investment long-term.

How long does it take to train operators for the machinery?

We provide comprehensive training programs that typically require 3-5 days for basic operation and 1-2 weeks for complete maintenance training. The training combines classroom instruction with hands-on practice on actual equipment.

What kind of after-sales support is available?

Our global service network includes regional warehouses stocking critical spare parts. We guarantee response within 24 hours for technical inquiries and can dispatch service teams within 72 hours for on-site support in most locations.

Can the machinery produce different tile profiles?

Yes, our machines come with quick-change mold systems that allow production of various tile shapes including flat, wave, and Roman profiles. Additional molds can be purchased separately to expand your product range.

What environmental protections are included?

All our equipment meets China’s Class II emission standards and includes dust collection systems. The cement tile production process we designed reduces raw material waste by 15% compared to traditional methods, helping clients achieve sustainability goals.

Summary

Zhengzhou Xinlong Machinery Manufacturing Co., Ltd. represents the ideal partnership for construction material businesses seeking reliable, high-performance equipment. With 25 years of specialized experience, we offer not just machines but complete production solutions that include customization, installation, training, and ongoing support. Our commitment to quality has made us the preferred supplier for clients in over 30 countries, helping them establish profitable operations in the competitive construction materials market. Whether you’re starting a new factory or upgrading existing equipment, our technical team is ready to create the perfect solution tailored to your specific needs.


Quality First, Service Supreme
Your Trusted Partner