Zhengzhou Xinlong Machinery Manufacturing Co., Ltd. stands as a beacon of excellence in China’s cement tile machinery industry. With a rich history spanning 25 years since our establishment in 2001, we’ve evolved from a local workshop to a globally recognized manufacturer of high-quality cement tile production equipment. Our 30,000-square-meter factory in Zhengzhou serves as the production hub for our innovative machinery, which includes cement tile machines, terrazzo floor tile machines, and permanent formwork equipment.

Our Journey: From Local Workshop to Global Supplier
The story of Zhengzhou Xinlong began in 2001 when we started manufacturing basic cement tile equipment. Over the years, we’ve invested heavily in research and development, transforming our production capabilities to meet international standards. Our technical team, comprising seasoned engineers with decades of industry experience, has been instrumental in this transformation. They continuously improve our machinery through rigorous testing and quality control processes that meet ISO 9001 certification requirements.
What sets us apart as a China cement tile machine manufacturer is our commitment to innovation. In the early 2000s, we recognized the growing demand for colorful cement tiles that could replace traditional clay tiles. We developed specialized production lines that could manufacture these advanced tiles with superior durability and aesthetic appeal. This strategic move positioned us as pioneers in the industry, helping us secure patents for several key technologies.
Comprehensive Product Range for Diverse Applications
Our product portfolio reflects our deep understanding of the construction materials industry. The cement tile machines we produce create tiles with exceptional properties: vivid colors that resist fading, high compressive strength (exceeding 35MPa), and excellent weather resistance. These tiles have become preferred choices for residential roofing, commercial buildings, and public infrastructure projects across 30 provinces in China and in over 20 countries worldwide.
The terrazzo floor tile machines in our lineup represent another area of expertise. These machines produce durable, easy-to-clean flooring solutions ideal for high-traffic areas like shopping malls, hospitals, and schools. Our permanent formwork equipment, designed for concrete wall construction, offers significant time and labor savings compared to traditional methods, making it popular among construction contractors seeking efficiency.
| Product Category | Key Features | Production Capacity |
|---|---|---|
| Cement Tile Machines | Automatic coloring system, hydraulic pressing, digital control | 8,000-12,000 tiles/day |
| Terrazzo Tile Machines | Vibration compaction, precise thickness control, multiple pattern options | 5,000-8,000 tiles/day |
| Permanent Formwork Equipment | Reusable panels, quick assembly, reduces concrete usage | 200-500 sqm/day |
Customization: Our Core Competitive Advantage
As a forward-thinking China cement tile machine supplier, we understand that no two clients have identical requirements. This realization drives our approach to customization. Whether you need machinery adapted for specific tile dimensions, production volumes, or material compositions, our engineering team collaborates closely with you to develop tailored solutions.
Our customization process begins with detailed discussions about your production goals, budget constraints, and site conditions. We then create 3D design models using advanced CAD software, allowing you to visualize the equipment before manufacturing begins. This approach has helped us deliver specialized machines for unique applications, including:
- Low-noise cement tile machines for residential area factories
- Energy-efficient terrazzo tile machines with solar power options
- Compact permanent formwork systems for urban renovation projects
- Multi-color mixing systems for creating custom tile patterns

Overseas Installation Guidance: Ensuring Your Success
Our commitment to client success extends beyond manufacturing. We provide comprehensive overseas installation guidance services that include:
1. Site Preparation Assistance: Our engineers help you assess your factory space, power requirements, and raw material storage needs to optimize machine placement and workflow.
2. On-Site Training: We conduct hands-on training for your operators and maintenance personnel, covering machine operation, routine maintenance, and troubleshooting procedures.
3. Production Optimization: After installation, we work with your team to fine-tune production parameters for maximum efficiency and product quality.
4. Ongoing Support: Our after-sales service team remains available for technical support, spare parts supply, and periodic maintenance checks.
This end-to-end service model has made us a preferred partner for international clients seeking reliable China cement tile machine vendors. We’ve successfully installed equipment in Southeast Asia, the Middle East, Africa, and South America, adapting our approach to suit local climate conditions, labor practices, and market preferences.
Quality Assurance: Our Promise to Every Client
At Zhengzhou Xinlong, quality isn’t just a buzzword—it’s embedded in every aspect of our operations. From raw material selection to final product testing, we implement strict quality control measures that include:
Material Inspection: All components undergo rigorous testing for durability, corrosion resistance, and precision fit before assembly.
Production Monitoring: Our ISO-certified manufacturing process uses statistical process control (SPC) techniques to maintain consistent quality standards.
Load Testing: Every machine undergoes simulated production runs to verify performance under actual working conditions.
Safety Certification: Our equipment meets CE safety standards and includes comprehensive safety interlocks to protect operators.
This commitment to quality has earned us long-term partnerships with major construction material producers worldwide. Many clients report that our machines have helped them increase production capacity by 40-60% while reducing waste and energy consumption.
FAQ
What makes Zhengzhou Xinlong different from other China cement tile machine manufacturers?
Our 25-year specialization in cement tile machinery, combined with our customization capabilities and overseas installation services, creates a comprehensive solution few competitors can match. We focus exclusively on construction material equipment, allowing us to develop deeper expertise than general machinery manufacturers.
How long does it take to produce customized cement tile machines?
Production timelines vary based on complexity, but standard customized models typically take 60-90 days from design approval to delivery. We maintain strategic stockpiles of common components to expedite production for urgent orders.
What kind of after-sales support do you provide?
We offer 12 months of warranty coverage and lifetime technical support. Our after-sales team includes engineers fluent in English, Spanish, and Arabic to assist international clients. We also maintain a global spare parts inventory to minimize downtime.
Can your machines produce tiles with special shapes or textures?
Yes, our cement tile machines accept custom molds that can create virtually any shape or texture. We’ve produced machines capable of making tiles with wood grain patterns, stone textures, and even 3D relief designs for decorative applications.
Summary
Zhengzhou Xinlong Machinery Manufacturing Co., Ltd. represents the pinnacle of China cement tile machine manufacturing. With 25 years of dedicated experience, we’ve developed production solutions that combine cutting-edge technology with practical, field-tested designs. Our comprehensive service approach—from custom equipment design to overseas installation guidance—ensures that clients worldwide can achieve optimal production results. As the construction industry continues to evolve, we remain committed to innovation, quality, and customer satisfaction, solidifying our position as the preferred China cement tile machine supplier for discerning international clients.