Zhengzhou Xinlong Machinery Manufacturing Co., Ltd. stands as a premier manufacturer in the construction materials equipment industry, specializing in automatic cement tile machines, terrazzo floor tile machines, and non-removable formwork equipment. With over 25 years of production experience since our establishment in 2001, our company has developed into a comprehensive solution provider with a 30,000 square meter factory, robust technical capabilities, and complete quality inspection systems.

Core Product Advantages
Our automatic cement tile machines represent the pinnacle of modern roofing material production technology. These machines produce colored cement tiles that were originally imported from abroad in the 1990s, but now surpass international standards in quality and performance. The tiles feature vibrant colors, high strength, and exceptional durability with resistance to storms, water penetration, and weathering. With service lives exceeding 30 years under normal conditions, our tiles provide an eco-friendly alternative to traditional clay tiles, helping protect arable land resources.
The production equipment we manufacture incorporates several key advantages:
- Fully automatic operation reducing labor costs by 60%
- Precision control systems ensuring consistent tile quality
- Modular design allowing easy maintenance and upgrades
- Energy-efficient motors cutting power consumption by 35%
- Customizable production parameters for different tile specifications
Technical Capabilities and Quality Assurance
As a source manufacturer, we maintain complete control over the production process from raw material selection to final product testing. Our technical team comprises 45 engineers with an average of 12 years’ experience in construction machinery development. The company invests 15% of annual revenue in R&D, resulting in 12 patents for tile production technology.
Our quality assurance system includes:
- ISO 9001:2015 certified production processes
- 100% inspection of critical components before assembly
- 72-hour continuous operation testing for complete machines
- Real-time monitoring of production parameters
- Traceability system for all manufactured equipment

Customization and Overseas Services
Understanding the diverse needs of global clients, we offer comprehensive customization services. Our engineering team works closely with customers to design equipment that meets specific production requirements, including tile dimensions, output capacity, and automation levels. Typical customization options include:
| Customization Parameter | Available Options |
|---|---|
| Tile Size | 300-600mm length, 200-400mm width |
| Production Capacity | 1,000-10,000 tiles/day |
| Automation Level | Semi-automatic to fully automatic |
| Power Supply | 380V/50Hz or customized |
| Color Mixing | Single color to multi-color blending |
Our overseas service network covers 32 countries, providing professional installation, commissioning, and operator training. Each project is assigned a dedicated service team consisting of mechanical engineers, electrical engineers, and process technicians to ensure smooth equipment operation from day one.
Market Performance and Customer Recognition
With products exported to 45 countries and regions, Zhengzhou Xinlong has established itself as a trusted brand in the international construction materials equipment market. Our equipment operates in diverse climatic conditions from the Middle East’s desert heat to Northern Europe’s cold winters, consistently delivering reliable performance. Notable projects include:
- A 5,000 tiles/day production line in Saudi Arabia
- Customized equipment for a Russian client producing architectural tiles
- Complete solution for a Vietnamese company entering the roofing materials market
- Multi-machine installation for a Brazilian construction materials conglomerate
Customer feedback consistently highlights three key strengths of our equipment:
- Low failure rate (less than 0.5% monthly)
- Energy efficiency (average 32% lower consumption than competitors)
- Ease of maintenance (common parts available within 48 hours globally)
FAQ
What makes your automatic cement tile machines different from other manufacturers?
Our machines feature three unique advantages: first, the patented double-layer pressing technology ensures tile density uniformity; second, the intelligent control system automatically adjusts production parameters based on raw material moisture content; third, our modular design allows easy maintenance without specialized tools. These innovations come from 25 years of continuous improvement based on customer feedback.
How do you ensure the quality of exported equipment?
We implement a five-stage quality control process for all export orders: 1) Raw material inspection with third-party certificates; 2) Component testing before assembly; 3) 72-hour continuous operation test; 4) Pre-shipment inspection by SGS or similar agency; 5) Loading supervision with photo documentation. This ensures every machine meets international standards before leaving our factory.
What after-sales support do you provide for overseas customers?
Our overseas service package includes: 1) One-year warranty covering all parts and labor; 2) Lifetime technical support through our 24/7 hotline; 3) Spare parts supply within 48 hours in major regions; 4) Annual maintenance service contracts; 5) Operator training programs covering both theory and practical operation. We also maintain a global spare parts inventory worth over $2 million to ensure quick replacements.
Can you customize equipment for special tile designs?
Yes, customization is our core strength. We have developed specialized molds and production processes for various tile designs including Spanish tiles, Roman tiles, and custom architectural profiles. Our engineering team can work with your design drawings to create production solutions for even the most complex tile geometries.
What is the typical production cycle for a complete tile production line?
For standard configurations, the production cycle is 45-60 days from order confirmation to shipment. This includes: 1) 7 days for detailed design review; 2) 25-30 days for manufacturing; 3) 5 days for assembly and testing; 4) 3-5 days for packaging and documentation. Customized equipment may require additional time depending on the complexity of modifications.
Summary
Zhengzhou Xinlong Machinery Manufacturing Co., Ltd. represents the ideal partner for businesses seeking reliable, high-performance automatic cement tile production equipment. With 25 years of specialized manufacturing experience, complete technical capabilities, and a customer-centric approach, we deliver solutions that maximize production efficiency while minimizing operating costs. Our commitment to continuous innovation ensures our equipment remains at the forefront of industry technology, helping clients worldwide achieve sustainable growth in the competitive construction materials market.